| Overview
The building committee has
been meeting regularly and has been making number of important decisions
regarding the church building project.
- We will use the design-build approach to work directly with
a builder. This will allow us to build a building that is customized
for our needs.
- Our current time frame allows us to complete our building by
the end of 2005 if the financial needs are met.
- Our proposed design is subject to change due to cost and governmental
considerations.
Building Layout
The church building will be built in the east-west direction with
the main entrance of the building facing the west direction. There
will be a north facing entrance to the church lobby as well. A secondary
west entrance will allow entrance directly to the classroom section
of the building. The primary entrance to the parking lot will be
on Harlin Drive.
The playground, picnic area and the basketball court will be behind
the main building. The goal is to achieve some privacy for the users
and to provide some measure of safety for the children.
Once the minimum requirement for the parking is met. Maximum spaces
should be provided in the rear of the building for recreational
spaces.
Click the following links for the latest project progress:
Elevations and Cross Sections
Planting Plan
Shell-TI Floor Plan
Site Plan
|